韩国三级视频-日韩操-视频一二区-久草欧美-五月天婷婷丁香花-动漫美女靠逼-韩国一区二区三区视频-美女扒开内裤让男人桶-亚洲AV无码精品一区二区三区-无码内射中文字幕岛国片-亚洲成色网

 
Construction of Thai-Chinese high-speed rail to start fully next year: Thai official
                 Source: Xinhua | 2018-06-03 12:09:33 | Editor: huaxia

File photo taken on Dec. 22, 2017 shows people visit a model of the first phase of the high-speed railway linking Bangkok with Nakhon Ratchasima province in Pak Chong, Thailand. (Xinhua/Li Mangmang)

BANGKOK, June 2 (Xinhua) -- The construction of a Thai-Chinese high-speed rail between Bangkok and Nakhon Ratchasima in northeastern Thailand is expected to get fully started early next year, following biddings later this year, said Transport Minister Arkhom Termpittayapaisith on Friday.

Arkhom, who co-chaired the 24th meeting of the Joint Committee on Thailand-China Cooperation on Rail Project with Ning Jizhe, deputy head of China's National Development and Reform Commission, said the construction of the main sections of the first phase of the high-speed rail from Bangkok to northeastern province of Nakhon Ratchasima will start in March next year.

The entire 253-km route between Bangkok and Nakhon Ratchasima is divided into 14 sections, two of which are considered minor sections located in the northeastern province, including an initial 3.5-km-long section currently under construction between Klang Dong and Pang Asok stations, which started late last year.

Of the 12 main sections, six sections will be open to biddings in September this year, followed by the construction scheduled to begin in March next year, whereas the other six sections will be open to biddings in November this year, followed by the construction to begin in April next year, according to the transport minister.

Meanwhile, the 350-km high-speed rail between Nakhon Ratchasima and Nong Khai, which is facing the Lao capital Vientiane across Mekong River, will be implemented by Thailand with China acting as consultants in terms of feasibility study and design, Arkhom said.

The feasibility study and design are scheduled to be finished within this year so that the construction will begin next year, the minister noted, adding that they will work hard to make both phases, or the whole high-speed rail from Bangkok to Nong Khai, operational at the same time.

Another bridge across Mekong River will be built to accommodate the high-speed railway, which is designed to link southern China with Thailand through Laos.

Back to Top Close
Xinhuanet

Construction of Thai-Chinese high-speed rail to start fully next year: Thai official

Source: Xinhua 2018-06-03 12:09:33

File photo taken on Dec. 22, 2017 shows people visit a model of the first phase of the high-speed railway linking Bangkok with Nakhon Ratchasima province in Pak Chong, Thailand. (Xinhua/Li Mangmang)

BANGKOK, June 2 (Xinhua) -- The construction of a Thai-Chinese high-speed rail between Bangkok and Nakhon Ratchasima in northeastern Thailand is expected to get fully started early next year, following biddings later this year, said Transport Minister Arkhom Termpittayapaisith on Friday.

Arkhom, who co-chaired the 24th meeting of the Joint Committee on Thailand-China Cooperation on Rail Project with Ning Jizhe, deputy head of China's National Development and Reform Commission, said the construction of the main sections of the first phase of the high-speed rail from Bangkok to northeastern province of Nakhon Ratchasima will start in March next year.

The entire 253-km route between Bangkok and Nakhon Ratchasima is divided into 14 sections, two of which are considered minor sections located in the northeastern province, including an initial 3.5-km-long section currently under construction between Klang Dong and Pang Asok stations, which started late last year.

Of the 12 main sections, six sections will be open to biddings in September this year, followed by the construction scheduled to begin in March next year, whereas the other six sections will be open to biddings in November this year, followed by the construction to begin in April next year, according to the transport minister.

Meanwhile, the 350-km high-speed rail between Nakhon Ratchasima and Nong Khai, which is facing the Lao capital Vientiane across Mekong River, will be implemented by Thailand with China acting as consultants in terms of feasibility study and design, Arkhom said.

The feasibility study and design are scheduled to be finished within this year so that the construction will begin next year, the minister noted, adding that they will work hard to make both phases, or the whole high-speed rail from Bangkok to Nong Khai, operational at the same time.

Another bridge across Mekong River will be built to accommodate the high-speed railway, which is designed to link southern China with Thailand through Laos.

010020070750000000000000011100001372269041
主站蜘蛛池模板: 合山市| 青浦区| 温宿县| 兴国县| 清水河县| 横峰县| 清水县| 安远县| 阿荣旗| 河津市| 灌云县| 长沙县| 永新县| 平凉市| 漳平市| 晋江市| 贵阳市| 孝感市| 镶黄旗| 晴隆县| 渭南市| 宣化县| 绍兴县| 龙门县| 岑巩县| 包头市| 天门市| 来宾市| 集安市| 金川县| 利津县| 政和县| 浑源县| 烟台市| 丹东市| 织金县| 拜泉县| 乌苏市| 凤山县| 新密市| 黑龙江省|