韩国三级视频-日韩操-视频一二区-久草欧美-五月天婷婷丁香花-动漫美女靠逼-韩国一区二区三区视频-美女扒开内裤让男人桶-亚洲AV无码精品一区二区三区-无码内射中文字幕岛国片-亚洲成色网

Africa  

Sudan, Ethiopia remain committed to Nile dam agreement: leaders

Source: Xinhua   2018-05-03 11:17:20

KHARTOUM, May 2 (Xinhua)-- Sudan and Ethiopia on Wednesday reiterated their commitment to the 2015 tripartite agreement they signed with Egypt to resolve the dispute on the upcoming Nile dam in Ethiopia.

Sudanese President Omar al-Bashir and Ethiopian Prime Minister Abiy Ahmed made the commitment during their talks in Khartoum.

"We are committed to the Declaration of Principles on the GERD (Grand Ethiopian Renaissance Dam) and to the importance of the tripartite committee," al-Bashir said.

He hoped the tripartite technical committee of Ethiopia, Egypt and Sudan would achieve cooperation in water security and overcome the barriers which halted the technical negotiations.

The Ethiopian prime minister reiterated his country's keenness to enhance strategic ties with Sudan in all fields and to work with Sudan to realize peace and development in the continent.

The last round of tripartite talks on GERD was suspended in April without reaching an agreement on the technical report prepared by French firms on the potential impact of the dam.

In December 2017, Egypt proposed to have the World Bank as a neutral party on the tripartite technical committee, but Ethiopia refused.

GERD, which will cost 4.7 billion U.S. dollars, is now 64 percent complete. Ethiopia hopes the project will provide a constant supply of clean and affordable power and accelerate its shift from an agricultural economy to an industrial powerhouse.

Ethiopia and Sudan eye massive benefits from the GERD construction, while Egypt is concerned it might affect its 55.5-billion-cubic-meter annual share of the Nile River water.

Editor: Li Xia
Related News
Home >> Africa            
Xinhuanet

Sudan, Ethiopia remain committed to Nile dam agreement: leaders

Source: Xinhua 2018-05-03 11:17:20

KHARTOUM, May 2 (Xinhua)-- Sudan and Ethiopia on Wednesday reiterated their commitment to the 2015 tripartite agreement they signed with Egypt to resolve the dispute on the upcoming Nile dam in Ethiopia.

Sudanese President Omar al-Bashir and Ethiopian Prime Minister Abiy Ahmed made the commitment during their talks in Khartoum.

"We are committed to the Declaration of Principles on the GERD (Grand Ethiopian Renaissance Dam) and to the importance of the tripartite committee," al-Bashir said.

He hoped the tripartite technical committee of Ethiopia, Egypt and Sudan would achieve cooperation in water security and overcome the barriers which halted the technical negotiations.

The Ethiopian prime minister reiterated his country's keenness to enhance strategic ties with Sudan in all fields and to work with Sudan to realize peace and development in the continent.

The last round of tripartite talks on GERD was suspended in April without reaching an agreement on the technical report prepared by French firms on the potential impact of the dam.

In December 2017, Egypt proposed to have the World Bank as a neutral party on the tripartite technical committee, but Ethiopia refused.

GERD, which will cost 4.7 billion U.S. dollars, is now 64 percent complete. Ethiopia hopes the project will provide a constant supply of clean and affordable power and accelerate its shift from an agricultural economy to an industrial powerhouse.

Ethiopia and Sudan eye massive benefits from the GERD construction, while Egypt is concerned it might affect its 55.5-billion-cubic-meter annual share of the Nile River water.

[Editor: huaxia]
010020070750000000000000011100001371531801
主站蜘蛛池模板: 盈江县| 六枝特区| 阳曲县| 景谷| 锦屏县| 安龙县| 朔州市| 皋兰县| 濮阳市| 岑巩县| 石门县| 双鸭山市| 克什克腾旗| 崇信县| 平邑县| 通河县| 宜都市| 平凉市| 沙坪坝区| 福清市| 双流县| 青海省| 舟山市| 奉贤区| 昌平区| 休宁县| 改则县| 乳山市| 波密县| 凯里市| 靖边县| 屏东县| 镶黄旗| 白河县| 达州市| 霍邱县| 辽宁省| 安丘市| 宁化县| 桑植县| 习水县|